-
To install the people counter devices & setup the system at the back office.
-
Install people counter, CAT 5e network cables, router/modem setup at the back office
METHODOLOGY
FootfallCam 3D Plus people counting systems are easily installed in the store, usually at the middle of doorway, facing perpendicularly down to count people coming in or going out when they passing by the counter. Counter should be installed at the top of the ceiling, as close to the door as possible (usually is 1m from the entrance).
A people counter is mounted directly on the surface of a ceiling and, therefore, completely visible. Surface mounting is commonly used for installation and it is easy to be done.
The installation for one counter camera is simple and easy. To connect Wi-Fi routers with people counter at the entrance ceiling, engineers need to run 1x CAT 5e network cable from back office to the entrance (door). The CAT 5e cable will be hidden inside the ceiling. Lastly, screw the people counter onto the ceiling using a ladder if required.
There are no drilling, lightning or noisy works during installation. The installation can be done quietly during the day, and will not affect the customers shopping experience.
Risk Assessment
|
Hazards |
Persons at Risk |
Control Measures |
Any actions to reduce the risk further |
1 |
Falls from height |
People counter engineers |
- Engineer to ensure ladders/access equipment is of adequate height - Ensure all access equipment suitable for purpose, checked before use and maintained in good condition - Choose the right work equipment and select collective measures to prevent falls |
- make sure all work at height is planned, organised and carried out by competent persons - Reporting procedure in place for identified defective items with prompt removal /remedial action. |
2 |
Electrical equipment & electricity |
People counter engineers |
- Use the correct tools and equipment for the job. - Use low voltage up to 24V DC battery tools whenever possible - Keep tools in good condition |
- Report defects in workplace equipment. Use the required safety equipment and protective clothing. |
3 |
Use of portable tools - equipment |
People counter engineers |
- Use low voltage up to 24V DC battery tools whenever possible |
|
4 |
Fall of objects |
People counter engineers |
- All objects, materials and tools to be secured or safely stored (small containers on platforms etc.) |
|
5 |
Slips and trips |
Staff and visitors |
- General good housekeeping. All areas well lit, including stairs. No trailing leads or cables. Keeps work areas clear, e.g. no equipments, cables left in walkways |
Keep the work area clear after the job has done. |